Installing 180 gear legs
Moderators: GAHorn, Karl Towle, Bruce Fenstermacher
Installing 180 gear legs
I am going to install the 180 legs on my 170. Any suggestions for a cradle or jig to hold the aircraft while changing the gear legs? My IA says the a/c must be level(?). Any other additional info, heads up or cautions would be appreciated. Thanks
Marty,
N8249A, 52' 170B
Hangar 130(North Hangars) KSAC
N8249A, 52' 170B
Hangar 130(North Hangars) KSAC
For what it's worth.....I recently replaced the left outboard landing gear bracket (installed PPONK) by hoisting the front of the aircraft so that both MLG are clear of terra firma. Used a sling about 3 to 4 inches wide positioned immediately forward of the MLG fuselage cutouts. Watch the venturis. IF you choose to do something like that, suggest you remove the battery and empty the fuel tanks as much as possible to lighten the load. Worked for me. Don't understand the requirement for leveling the aircraft. Good luck.
-
- Posts: 2271
- Joined: Tue Apr 23, 2002 12:11 am